Heat Pump Boiler Sizer

Hydronic heat-pump / heat-recovery chiller sizing for boiler replacement
Projects
Scenarios
Smart Intake & File Analysis project-level — existing system data shared across all scenarios
⚙ AI settings — only needed when running this as a local file or your own host
Two ways to run the AI on your own host: (1) a proxy URL — a Cloudflare Worker that holds the key server-side (see proxy/README.md), so no key ever touches this page; or (2) an API key — your browser then calls Anthropic directly (held in memory only, never saved, but readable in this page, so use a scoped key). The proxy URL is saved in this browser only. Inside Claude.ai you need neither.
01Existing equipment
⇪ Photo of nameplate / unit AI reads model, serial, capacity, eff…
and / or type details
existing plant —
02Utility bills
⇪ Drop / choose bill CSV date, therms, gas$, kWh, elec$
or annual totals
03Existing system trend data
⇪ Drop / choose BMS trend CSV timestamp, supply °F, return °F, GPM, OAT…
04Proposed equipment cut sheet
⇪ Drop / choose cut-sheet PDF heat pump submittal / spec sheet
Flow: ① bring in data → ② confirm the sizing inputs → ③ review results & cost on the right.
Load & Existing Conditions shared
Current system — the design basis your existing terminals were sized around
ΔT —
Source & Performance scenario
Heat-pump delivered — what the proposed unit can actually produce
Performance assumptions
Sizing Strategy scenario
Plant configuration
Electrical assumptions
Run Time & Operating Cost sharedoptional
Sizing Result
HP heating capacity
MBH
at design conditions
Design COP
heating
Electrical input
kW
— A
Suggested selection
nominal capacity
Delivered Temp & Terminal Check can the existing terminals heat the space?
Plant Configuration modules, redundancy & turndown
Feasibility & Checks
COP Sensitivity
Annual Operating Cost all-electric vs boiler
Scenario Comparison all scenarios in this project
Screening tool for early-design and proposal use. COP is modeled as Carnot efficiency × 2nd-law factor across the source-to-sink thermal lift, not manufacturer performance data — always confirm selections against AHRI-certified capacity and COP at your exact entering/leaving conditions, and verify low-ambient derate, defrost penalties, and minimum source temperatures with the equipment vendor.